EXCEEDS logo
Exceeds
Bojan Rosko

PROFILE

Bojan Rosko

Worked on the tenstorrent/tt-metal repository, delivering eight features and resolving three bugs over five months. Focused on improving build stability, dependency management, and integration reliability, this developer updated UMD submodules, refactored tunnel assignment logic, and enhanced CI/CD workflows using C++, YAML, and GitHub Actions. They streamlined code by removing unused parameters, modernized CI runner labeling, and improved ethernet API clarity. Their work included synchronizing chiplock dependencies, refining firmware reset handling for RISC cores, and enabling TTSIM configurability. These efforts strengthened cross-repo compatibility, reduced technical debt, and improved testability, supporting smoother deployments and more robust embedded system development.

Overall Statistics

Feature vs Bugs

73%Features

Repository Contributions

38Total
Bugs
3
Commits
38
Features
8
Lines of code
476
Activity Months5

Your Network

845 people

Shared Repositories

488
vigneshkeerthivasanxMember
130bb56Member
velonicaMember
myplyMember
Tsisen.TMember
=Member
Abhishek AgarwalMember
Almeet BhullarMember
Abirami RajasekaranMember

Work History

September 2025

11 Commits • 2 Features

Sep 1, 2025

September 2025 monthly summary for tenstorrent/tt-metal: Delivered key feature integrations for UMD with chiplock and TTSIM, improved firmware reset value handling for RISC cores, and enhanced simulator path usage and architecture discovery with TTSIM configurability. These changes strengthen platform stability, reduce initialization issues, and streamline emulation workflows, delivering measurable business value in reliability, testability, and time-to-market.

August 2025

8 Commits • 1 Features

Aug 1, 2025

In August 2025, delivered consolidated UMD subproject dependency updates for tenstorrent/tt-metal, focusing on build stability and compatibility with the main project. The work centered on synchronizing the chiplock submodule and incorporating the latest dependency commits across the UMD subproject, resulting in a more robust integration path and smoother CI. A series of fixes were applied to address build and test failures, reflected in commit activity such as: umd test_chiplock, add umd chiplock, bump umd, umd with fix, newer umd with fixes, newer umd fixes build, update umd. These updates align UMD with current mainline expectations and reduce risk for downstream features.

July 2025

14 Commits • 3 Features

Jul 1, 2025

Monthly summary for 2025-07 (tenstorrent/tt-metal).

May 2025

4 Commits • 2 Features

May 1, 2025

May 2025 monthly summary for tenstorrent/tt-metal focusing on reliability and topology integration. Delivered two major features: UMD Dependency Updates and Topology Integration Fix, and Tunnel Assignment Logic Refactor for Reliability. Key outcomes include improved tunnel setup reliability, updated UMD to newer version with topology fixes, removal of legacy configure eth step, and better device ID handling and connectivity checks. Business impact: reduced integration risk during topology changes, smoother deployments, and higher confidence in network topology updates. Technologies/skills demonstrated include dependency management, refactoring for reliability, topology integration, and connectivity validation.

April 2025

1 Commits

Apr 1, 2025

April 2025: Codebase cleanup and maintenance in tenstorrent/tt-metal focused on removing an unused parameter and updating the submodule to streamline maintenance and reduce risk. This work reduces technical debt, improves build reliability, and sets a cleaner baseline for upcoming features.

Activity

Loading activity data...

Quality Metrics

Correctness97.4%
Maintainability94.2%
Architecture94.2%
Performance94.2%
AI Usage26.4%

Skills & Technologies

Programming Languages

C++NoneYAML

Technical Skills

API designC++C++ developmentCI/CDContinuous IntegrationDependency ManagementDevOpsGitHub ActionsNoneVersion ControlYAML configurationbuild optimizationcode refactoringembedded systemsenvironment configuration

Repositories Contributed To

1 repo

Overview of all repositories you've contributed to across your timeline

tenstorrent/tt-metal

Apr 2025 Sep 2025
5 Months active

Languages Used

C++NoneYAML

Technical Skills

C++ developmentsoftware engineeringversion controlDependency ManagementNoneembedded systems