EXCEEDS logo
Exceeds
citrahlzh

PROFILE

Citrahlzh

Citra Halijah contributed to the berbinarin/berbinarin repository over seven months, delivering fourteen features and resolving six bugs across backend and frontend systems. She enhanced paid registration flows, implemented robust feedback and admin dashboards, and improved pricing accuracy and asset management. Using Laravel, PHP, and JavaScript, Citra refactored routing, centralized asset handling, and introduced UI/UX improvements such as global form validation and Lottie-based animations. Her work addressed data integrity, performance, and maintainability, including the adoption of WebP images and streamlined CSS loading. The depth of her contributions reflects a strong grasp of full stack development and scalable web application design.

Overall Statistics

Feature vs Bugs

70%Features

Repository Contributions

44Total
Bugs
6
Commits
44
Features
14
Lines of code
7,020
Activity Months7

Your Network

11 people

Work History

December 2025

3 Commits • 1 Features

Dec 1, 2025

2025-12 monthly summary for berbinarin/berbinarin: Delivered a winter-themed landing page enhancement by integrating a Snow Animation (Lottie). Implemented robust asset loading by fixing Lottie file paths and directory structure, ensuring consistent playback in development and production environments. This work is backed by three commits that improved documentation and asset management.

November 2025

1 Commits • 1 Features

Nov 1, 2025

Month: 2025-11 — Summary of work in berbinarin/berbinarin. The month focused on performance-forward asset optimization by adopting WebP image format across controllers to replace PNGs, delivering faster page loads and reduced bandwidth. Commit 91643bb47adc73abf2ae0043448516b50986484c updated the image format to WebP and standardised asset handling across controllers.

October 2025

3 Commits • 2 Features

Oct 1, 2025

October 2025 monthly summary for berbinarin/berbinarin focusing on delivering user-centric onboarding improvements, data integrity, and actionable management insights. This period centered on two major feature areas and associated bug fixes: (1) Counseling Staff Registration UX and Global Form Validation, with UI improvements, field-level validation, and a terms modal to ensure data integrity during submission, supported by routing fixes to ensure smooth navigation. (2) Manager CPM Dashboard Data Management and Visualization, enabling CRUD operations for peer counselor data and introducing data visualization to enhance management oversight.

September 2025

3 Commits

Sep 1, 2025

Month: 2025-09 — Berbinarin (berbinarin/berbinarin) monthly summary focusing on key accomplishments and fixes. Key features delivered and bugs fixed: - Pricing Calculation and Display Accuracy (bug): Corrected pricing logic for counseling sessions and psych test packages; aligned displayed prices with correct calculations; ensured weekend adjustments and invalid date handling; updated user-facing price display. Commits: 643c386fc5b9114c01c337ea8d6b1bb2423343bc; e57cdd741578b18e81d784c20f67149911562b27. - DataTables Path Typo Fix (bug): Fixed incorrect JavaScript path for the DataTables library to ensure proper loading and stabilize form data tables. Commit: b0dc672b2d70037d72478f0f1c99d4a1c8027560.

August 2025

17 Commits • 7 Features

Aug 1, 2025

August 2025 monthly performance summary for berbinarin/berbinarin focused on admin stability, pricing accuracy, and UI/UX polish. Delivered a stable admin dashboard experience, refreshed pricing/packages, and enhanced counseling/psikotest UI, while improving error handling and maintainability across the platform.

July 2025

11 Commits • 1 Features

Jul 1, 2025

July 2025: Stabilized core navigation and improved asset reliability across berbinarin/berbinarin. Delivered four high-impact changes: (1) Premium Class route introduced with updated view path, named route usage, and corresponding layout/assets fixes to ensure accessibility and visual coherence; (2) Emo Shuffle route fixed and refactored into a dedicated EmoShuffleController to eliminate access issues; (3) Bisikan route routing corrected to BisikanController@index to restore feature access; (4) Image rendering corrections across landing and content pages by centralizing image paths in /image/ and fixing author/profile/article images. These changes collectively reduce user friction, improve maintainability, and strengthen the platform's ability to scale feature routing and asset management.

June 2025

6 Commits • 2 Features

Jun 1, 2025

June 2025: Delivered key backend and routing improvements for berbinarin/berbinarin, enabling paid psikotest registration with scheduling, enhanced user feedback flow, and stabilized navigation. Implementations include new controllers and routes for paid registrations, date handling fixes, redirect stability, and a cross-module feedback subsystem; plus a dashboard path fix after a rename to prevent routing errors. These changes reduce friction in paid registrations, strengthen feedback loops, and improve maintenance and scalability.

Activity

Loading activity data...

Quality Metrics

Correctness87.4%
Maintainability88.2%
Architecture81.8%
Performance87.6%
AI Usage21.0%

Skills & Technologies

Programming Languages

BladeCSSHTMLJavaScriptPHP

Technical Skills

Backend DevelopmentBlade TemplatingCSSFile ManagementForm HandlingForm ValidationFront End DevelopmentFrontend DevelopmentHTMLJavaScriptLaravelLottiePHPRefactoringRoute Management

Repositories Contributed To

1 repo

Overview of all repositories you've contributed to across your timeline

berbinarin/berbinarin

Jun 2025 Dec 2025
7 Months active

Languages Used

BladePHPCSSHTMLJavaScript

Technical Skills

Backend DevelopmentLaravelRefactoringWeb DevelopmentBlade TemplatingFront End Development