EXCEEDS logo
Exceeds
Clément Prod'homme

PROFILE

Clément Prod'homme

Over 19 months, this developer delivered robust features and critical fixes across the betagouv/eva-serveur and Captive-Studio/renovate-config repositories, focusing on scalable backend systems, UI modernization, and automation. They engineered campaign lifecycle management, PDF export enhancements, and secure configuration workflows using Ruby on Rails, JavaScript, and SCSS. Their work included database migrations, component-based UI development, and internationalization, improving both user experience and maintainability. By integrating automated dependency management and CI/CD pipelines, they reduced operational risk and streamlined updates. Their technical approach emphasized code clarity, accessibility, and data integrity, resulting in a more reliable, auditable, and developer-friendly platform.

Overall Statistics

Feature vs Bugs

58%Features

Repository Contributions

452Total
Bugs
127
Commits
452
Features
176
Lines of code
40,334
Activity Months19

Your Network

39 people

Work History

June 2026

2 Commits • 1 Features

Jun 1, 2026

June 2026 (betagouv/eva-serveur) — Delivered two focused updates to strengthen literacy assessment and UI clarity. Added a new mispositioned-user profile to improve positioning accuracy and reduce abandonment in literacy assessments. Corrected the aberrant badge color from green to gray to avoid misinterpretation and to align with existing neutral/status colors in the UI. These changes are anchored by commits 7d1fc5f6dbe37acbf2da2a1299dac73f89f8eec8 and aa5a002e4a99e0d5776d589cb733983cdd555675.

May 2026

19 Commits • 4 Features

May 1, 2026

May 2026 – Betagouv Eva-serveur: Delivered EvaPro Evaluation Experience Enhancements with completion checks, prompts for incomplete EvaPro assessments, and improved evaluation index rendering; introduced EvaPro data migrations and organization (moved 2025 migrations into a dedicated folder and added a recalculation migration to ensure data completeness for production’s 139 EvaPro evaluations). Completed DSFR/UI modernization and accessibility work (DSFR updates, UI alignment fixes, improved JS integration, navigation visibility, and asset distribution). Strengthened test stability and build reliability (fixing flaky tests, silencing Capybara logs, removing flaky JS tests). Maintained repository hygiene by excluding unnecessary files (.pgsql). Business impact: higher reliability of EvaPro evaluations, validated data integrity in production, accessible and modern UI, quieter CI, and a cleaner codebase. Technologies demonstrated: DSFR integration, data migrations, test infrastructure (Capybara), JS/DSFR integration, accessibility best practices.

April 2026

39 Commits • 4 Features

Apr 1, 2026

Summary for 2026-04 (betagouv/eva-serveur): A strong month of security hardening, dependency modernization, and user-facing UI improvements, with extensive cleanup to align with DSFR and improve maintainability. Key outcomes include automated i18n integration and npm-based updates, security fixes across TarteauCitronJS and SQL injection vectors, and performance/UX improvements on the News page and invitation flow. Multiple mobile and Admin UX refinements were implemented, along with targeted code quality and linting improvements to reduce technical debt.

March 2026

1 Commits

Mar 1, 2026

Month: 2026-03 — Focused improvements on PDF rendering fidelity in EvaPro within betagouv/eva-serveur. Delivered a targeted fix for a whitespace gap between the container and the arrow tip in PDF output by applying print-specific styles. The adjustment ensures arrows render correctly in print media and enhances the fidelity of exported documents. The change is isolated and low-risk, with clear traceability to EVA-498.

February 2026

49 Commits • 24 Features

Feb 1, 2026

February 2026 — Key features delivered, critical bugs fixed, and engineering improvements across betagouv/eva-serveur and Renovate-config, with a focus on business value: robust Eva Pro PDF rendering, reliable Evapro balances, and streamlined development workflows.

January 2026

1 Commits • 1 Features

Jan 1, 2026

January 2026 monthly summary for Captive-Studio/renovate-config. Delivered an automation improvement that streamlines Docker image management within the Renovate configuration, reducing manual intervention and risk of drift. Implemented Automatic Docker Image Merge in Configuration, backed by a dedicated commit and change in the repository. This change improves build determinism, accelerates dependency updates, and simplifies contributor workflow. No critical bugs opened this month; the focus was on reliability and maintainability. Technologies/skills demonstrated include configuration automation, Docker image version handling, commit hygiene, and CI/CD collaboration.

December 2025

1 Commits • 1 Features

Dec 1, 2025

December 2025 performance summary for FabricMC/fabric-docs: Delivered the Custom Entity Attributes Documentation and Examples page, providing clear guidance and sample code to create and manage custom entity attributes in mods. This work enhances developer onboarding, accelerates attribute-driven gameplay enhancements, and strengthens ecosystem interoperability. No major bugs reported this month; the update is documentation-focused and low risk.

November 2025

1 Commits • 1 Features

Nov 1, 2025

November 2025 monthly summary focusing on key accomplishments for betagouv/eva-serveur. Key configuration change implemented to strengthen security and data integrity in critical structure settings, with RBAC controls verified by a targeted commit.

October 2025

49 Commits • 24 Features

Oct 1, 2025

Concise monthly summary for 2025-10: Key features delivered, critical bugs fixed, and substantial performance/experience improvements across the evaluator platform. Delivered an advisor evaluation comparison feature, applied i18n across UI, improved PDF rendering, added Restituation::EvaluationImpactGeneral to view evaluations and their impacts, and implemented API/UI refinements. Result: faster, more reliable beneficiary evaluations, improved user experience, and scalable reporting.

September 2025

30 Commits • 12 Features

Sep 1, 2025

September 2025: Enhanced reporting, evaluation comparison UX, and system stability. Delivered robust PDF exports, enabled PDF download of the comparison, and introduced risk metrics; restructured comparison logic for maintainability; improved code quality and fixed critical issues impacting user experience and reliability. Business value: more reliable reports, faster decision-making, and reduced support toil.

August 2025

24 Commits • 12 Features

Aug 1, 2025

August 2025 for betagouv/eva-serveur delivered targeted refactors, UI enhancements, accessibility improvements, and expanded evaluation capabilities that improve reliability, maintainability, and business value. Key outcomes include a foundational Beneficiary code rename across the codebase, new UI features (selectable Table, Button content text, improved disabled state), and enhanced evaluation comparison workflows. A set of stability fixes addressed Rollbar errors on pages and tables, plus redirects and text fixes on the comparison flow. Accessibility-related refinements and translation resource relocation further prepare for localization and inclusive UX. These changes reduce incident risk, shorten time-to-insight, and set the stage for more accurate reporting and analytics.

June 2025

7 Commits • 2 Features

Jun 1, 2025

June 2025: Delivered end-to-end code management improvements in betagouv/eva-serveur. Implemented Beneficiary Unique Code Generation with DB schema changes and a renamed code column to code_personnel, backed by tests; rolled out a reusable Code Display and Sharing UX with a copy-to-clipboard button and translations; resolved a UI spacing issue to ensure code snippets are selectable and copyable. These changes improve data clarity, code-sharing capabilities, and user experience across beneficiary and campaign workflows, delivering measurable business value and codebase maintainability.

May 2025

18 Commits • 4 Features

May 1, 2025

May 2025 monthly summary focusing on delivering a more robust and scalable campaign lifecycle, strengthening admin governance, and modernizing the dependency and build pipeline. The work spanned two repos (betagouv/eva-serveur and Captive-Studio/renovate-config) and emphasizes business value through safer campaign management, reduced operational risk, and smoother future upgrades.

April 2025

36 Commits • 12 Features

Apr 1, 2025

April 2025 performance summary: In betagouv/eva-serveur, we hardened data integrity and modeling, improved data pipelines, and expanded product capabilities. Key changes include StaticRecord for storing/loading static question data with scores frozen to ensure deterministic evaluation, and a metacompetence model with a refactor that renames QuestionData::Base to QuestionData. We delivered questionnaire export with variant management and guidance, and cleaned up data and tests to reduce divergence. We removed the livraison trait to simplify the feature surface. On observability and performance, we upgraded Bullet, surfaced N+1 queries to Rollbar, and addressed a performance slowdown in marketplace restitution. UI accessibility and polish were improved, including referential badge accessibility and literacy spacing, and code quality improved via RuboCop fixes. In Renovate-config, we laid groundwork for future UI component development with view_component and asynchronous jobs via solid_queue, and automated dependency management to streamline future PRs. This combination delivers measurable business value: more reliable data, easier maintenance, faster feature delivery, improved user experience, and a more maintainable CI/CD workflow.

March 2025

64 Commits • 35 Features

Mar 1, 2025

March 2025: Delivered concrete technical and business value across eva-serveur. Major deliverables include: Admin image management bug fix preventing 500 errors when deleting or modifying question images; Metacompetence data model enhancements (enum from integer to string, class refactor, name corrections, and migrations); performance optimization with an index on questions.type; extensive PDF export/rendering improvements (headless mode, Puppeteer error handling, inclusion of Place du marché subdomain results, CSS/DSFR updates, and UI polish); improved observability with Rollbar integration and error tracing (including user email context and Puppeteer error reporting).

February 2025

29 Commits • 15 Features

Feb 1, 2025

February 2025 highlights for betagouv/eva-serveur: Delivered core health monitoring improvements, advisor decision support, asset maintenance, and data flow robustness with UX enhancements. These efforts increase system reliability, reduce operational overhead, and accelerate evidence-based assessments for evaluators and advisers.

January 2025

55 Commits • 19 Features

Jan 1, 2025

January 2025 (2025-01) delivered a set of feature-rich enhancements to the EVA server, with a focus on reporting fidelity, advisor visibility, and performance, while stabilizing delivery through key PDF/export bug fixes and CI improvements. The integration of Ruby-lsp improves developer productivity and code quality. The month also expanded data integrity through metacompétences and broader visibility in the numeration export, enabling better decision support for users. Overall, the work enhanced client reporting accuracy, system reliability, and development efficiency.

December 2024

17 Commits • 3 Features

Dec 1, 2024

December 2024 monthly summary for betagouv/eva-serveur: Key bug fixes, features, and maintainability improvements across the codebase. Delivered stability for Place du Marche scoring and restitution, centralized and robust percentage calculations, and introduced profil4_plus. UI enhancements and componentization improved user experience and admin visuals. Code quality work reduced technical debt and aligned with linting standards, setting a foundation for faster, safer iteration.

November 2024

10 Commits • 2 Features

Nov 1, 2024

November 2024 performance summary across two repos: Captive-Studio/renovate-config and betagouv/eva-serveur. Focused on delivering automation for dependency updates, modernizing the Rails stack, and hardening data/import flows. The work reduced manual effort, improved reliability, and enabled faster delivery of features and fixes.

Activity

Loading activity data...

Quality Metrics

Correctness92.0%
Maintainability91.6%
Architecture87.6%
Performance88.0%
AI Usage20.2%

Skills & Technologies

Programming Languages

ARBArbArbreCSSDockerfileERBHTMLHTML ARBHTML ERBJSON

Technical Skills

API ConfigurationAPI DevelopmentAPI OptimizationAccess ControlAccessibilityActiveAdminActiveRecordAdmin Panel DevelopmentAsset ManagementAuthorizationBack-end DevelopmentBackend DevelopmentBackground Job ProcessingBootstrapBug Fix

Repositories Contributed To

3 repos

Overview of all repositories you've contributed to across your timeline

betagouv/eva-serveur

Nov 2024 Jun 2026
17 Months active

Languages Used

ERBRubyShellHTMLSCSSSQLSVGYAML

Technical Skills

Backend DevelopmentRuby on RailsTestingVersion ManagementCSSCode Formatting

Captive-Studio/renovate-config

Nov 2024 Feb 2026
5 Months active

Languages Used

RubyJSONJavaScriptRenovateShell

Technical Skills

Configuration ManagementDependency ManagementDevOpsRuby GemsBackground Job ProcessingRuby on Rails

FabricMC/fabric-docs

Dec 2025 Dec 2025
1 Month active

Languages Used

Java

Technical Skills

Javagame mechanicsmod development