EXCEEDS logo
Exceeds
Deb Bassett

PROFILE

Deb Bassett

Deb Bassett contributed to the Energy-Sparks/energy-sparks repository by delivering a wide range of features and stability improvements over 15 months, including new home page components, group dashboards, and issue management workflows. Deb’s work combined backend development in Ruby on Rails with frontend enhancements using SCSS and JavaScript, focusing on modular UI architecture and robust data handling. She implemented feature-flagged rollouts, background jobs, and caching strategies to ensure reliable deployments and maintainable code. Her engineering addressed business needs such as onboarding, reporting, and access control, while improving user experience and developer productivity through thoughtful refactoring and comprehensive test coverage.

Overall Statistics

Feature vs Bugs

80%Features

Repository Contributions

104Total
Bugs
11
Commits
104
Features
45
Lines of code
35,012
Activity Months15

Your Network

1 person

Shared Repositories

1

Work History

February 2026

1 Commits • 1 Features

Feb 1, 2026

February 2026 monthly summary for Energy-Sparks/energy-sparks. Focused on delivering a navigation improvement in Issue Management by implementing a redirect back to the previous page after creating or editing issues. This feature enhances user workflow, reduces context switching, and accelerates issue resolution across the team.

January 2026

9 Commits • 6 Features

Jan 1, 2026

January 2026 monthly summary for Energy-Sparks/energy-sparks highlighting security, usability, data export, and workflow improvements across issues tracking and project governance.

December 2025

14 Commits • 3 Features

Dec 1, 2025

December 2025: This month delivered significant business value through school-group data access enhancements, streamlined group settings navigation, and targeted reliability improvements. Key features include the School Status Page with onboarding, current energy data components, and enhanced CSV exports for school status and meter status, plus navigation enhancements and a link from the group dashboard. Group settings now have left-side navigation and refreshed access paths, with legacy feature flags removed or integrated to simplify usage. Performance has been boosted by improved pagination (Pagy) and stabilized Flipper caching, complemented by linting updates for Bootstrap class usage. Bug fixes include excluding meters for non data-visible schools in school group status CSV exports and conditional dashboard messaging to avoid displaying stale messages. Overall, these changes improve reporting accuracy, onboarding experience, and developer velocity while reducing technical debt.

November 2025

1 Commits

Nov 1, 2025

November 2025 (Energy-Sparks/energy-sparks) monthly summary: Focused on reliability and correctness of the points system. Delivered a refactor of the activity and intervention points calculation to robustly handle current, past, and future academic years, ensuring points are awarded correctly and bonus points for images are applied where appropriate. Implemented safeguards so observations outside the current academic year no longer earn points, aligning incentives with academic-year boundaries. This work reduces miscalculations in analytics and reporting, improving data integrity for stakeholders and auditors.

October 2025

4 Commits • 1 Features

Oct 1, 2025

October 2025 monthly summary focused on strengthening group-management UX and ensuring timeline reliability across schools with variable calendar data. Delivered front-end improvements for group context UI and navigation, plus robust calendar fallbacks to maintain timeline functionality in all scenarios.

September 2025

8 Commits • 3 Features

Sep 1, 2025

September 2025: Delivered major features across timelines, case studies, and group dashboards, with targeted bug fixes to improve data accuracy and admin workflows. Focused on UI/UX refinements, data handling, and access-control improvements to support better decision-making and governance reporting for schools and groups.

July 2025

9 Commits • 7 Features

Jul 1, 2025

July 2025 performance-driven delivery across Energy-Sparks/energy-sparks, focusing on user experience, conversion optimization, and site performance. Key outcomes include a redesigned pricing page with a feature flag and updated framing options; a complete newsletters page overhaul with improved sign-up routing; a training pages redesign enabled by an A/B test flag and improved event data handling; consolidation of product/marketing content with streamlined navigation; and a streamlined demo workflow with updated routes and enhanced campaign tracking. Additionally, a site-wide template caching initiative was implemented to boost page load times on non-admin pages, with corresponding tests updated.

June 2025

16 Commits • 5 Features

Jun 1, 2025

June 2025 performance summary: Focused delivery across the Energy-Sparks platform on a refreshed Case Studies experience, performance improvements for marketing pages, and site-wide UI polish, balanced with asset reliability and data ingestion enhancements. Key outcomes include a Case Studies Platform Refresh with a new page, improved image handling, admin UI improvements, and asset validation tweaks to reduce failures in production; marketing pages gained template caching to speed loads; the Home Page adopted the new design by removing the old flag; Entrust data feeds config enabled reliable meter-read ingestion; Education UI Cleanups improved clarity and consistency. Notable bug fixes addressed media errors and asset-type validation toggles, along with timing workflow adjustments, contributing to deployment stability. Technologies demonstrated include front-end asset optimization, template caching, feature-flag management, and data integration configuration, delivering measurable business value through faster page loads, improved content quality, and more reliable deployments.

May 2025

7 Commits • 4 Features

May 1, 2025

Concise monthly summary for Energy-Sparks/energy-sparks for 2025-05 focusing on business value, user impact, and technical execution. Major features delivered, bugs fixed, and overall accomplishments aligned with phased rollout and code health improvements.

April 2025

2 Commits • 1 Features

Apr 1, 2025

April 2025 (Energy-Sparks/energy-sparks): Key deliverables include the Front Page Blog Section with a dedicated blog fetch/cache service, a background job to refresh content, and UI components with updated styling and localization for seamless integration. Fixed a startup timing bug by moving UpdateBlogCacheJob to after_initialize, ensuring reliable application initialization. Repositories: Energy-Sparks/energy-sparks. Overall impact: improved homepage content freshness, greater reliability during startup, and a more maintainable caching workflow. Technologies demonstrated: Ruby on Rails, ActiveJob background processing, caching strategies, service objects, UI components, and i18n/localization.

March 2025

7 Commits • 4 Features

Mar 1, 2025

March 2025 Monthly Summary for Energy-Sparks/energy-sparks focused on delivering a richer home page experience, enhanced content management, and accessible, localized front-page sections to improve user engagement and onboarding. Implemented a modular UI strategy with new components and data models, enabling faster content iteration and admin workflows. Key accomplishments include launching the Testimonials feature and home page carousel with a new data model, admin pages, and UI refinements; adding the Audits and Organisations sections to the front page with responsive layouts, theming, and localization support; and delivering broader Home Page UI improvements such as a BadgeComponent, SectionHeaderComponent, improved image handling, and statement rendering with a tag component. Overall, these changes improve trust signals, content relevance, and localization reach while strengthening the front-end architecture for scalable content delivery.

February 2025

7 Commits • 2 Features

Feb 1, 2025

February 2025 performance summary for Energy-Sparks/energy-sparks: Delivered a grid-driven home page, polished the dashboard UI with alignment fixes and stable carousel indicators, standardized the footer across the application, and advanced developer tooling with Lookbook previews and explicit render refactors to improve maintainability. These improvements enhance user experience, visual consistency, and developer productivity while reducing CSS complexity and feature-flag dependencies.

January 2025

15 Commits • 5 Features

Jan 1, 2025

January 2025: Delivered key features and stability improvements across Energy-Sparks energy-sparks, focusing on end-user workflow, admin UX, localization reliability, and data integrity. Highlights include the Todos feature rollout with admin integration and feature-flag gating; active programme types display with safe redirection; programme listing UI enhancements (Started on / Ended on dates) with test alignment; dashboard message UI improvements; and removal of the intervention_type_search feature flag to simplify code. Bug fixes included Welsh logo locale correction with strengthened tests, UI relevance improvements by hiding the notes field in programme admin unless the item is an Audit, test-suite reliability improvements, and ensuring proper data nullification on user deletion. These changes drive smoother operations, higher adoption, and lower support overhead.

December 2024

1 Commits • 1 Features

Dec 1, 2024

December 2024 monthly summary for Energy-Sparks/energy-sparks: Delivered a new Todo Recording and Completion feature with a phased rollout using Flipper feature flags. Implemented backend support across controllers, models, and services to record and complete todos, enabling scalable task tracking within Energy Sparks. Prepared for QA and deployment with precise commit traceability and integration readiness.

November 2024

3 Commits • 2 Features

Nov 1, 2024

In 2024-11, Energy-Sparks/energy-sparks delivered two high-impact features that enhance reliability, localization, and program-management workflows, while addressing notable UI inconsistencies. The work supports business continuity with safer rollouts and consistent UX across error handling and programme-management activities.

Activity

Loading activity data...

Quality Metrics

Correctness90.2%
Maintainability88.0%
Architecture86.2%
Performance83.4%
AI Usage21.6%

Skills & Technologies

Programming Languages

CSSERBHTMLHTML ERBJavaScriptRSpecRubySCSSSQLXML

Technical Skills

API IntegrationAccess ControlBack End DevelopmentBack end developmentBack-end DevelopmentBackend DevelopmentBackground JobsBootstrapCSSCSS Preprocessing (SCSS)CSV handlingCachingCode OrganizationCode RefactoringComponent Development

Repositories Contributed To

1 repo

Overview of all repositories you've contributed to across your timeline

Energy-Sparks/energy-sparks

Nov 2024 Feb 2026
15 Months active

Languages Used

CSSHTMLJavaScriptRubySQLERBHTML ERBSCSS

Technical Skills

Backend DevelopmentDatabase DesignFeature FlaggingFrontend DevelopmentHTML/CSSInternationalization (i18n)

Generated by Exceeds AIThis report is designed for sharing and indexing