
Omar El Masaoudi developed navigation, mapping, and scheduling features for the MiniCapstone-Project/SOEN390 repository over three months, focusing on user-centric campus wayfinding and calendar integration. He implemented a directions system with Google Places Autocomplete, dynamic map rendering, and debounced API calls using React Native and TypeScript. Omar also built a multi-calendar scheduling UI, introduced robust event handling, and improved test infrastructure with Jest and Yarn. His work included refactoring for modularity, enhancing code coverage, and resolving authentication and merge conflicts, resulting in a maintainable codebase that supports reliable navigation, event management, and future feature expansion for mobile users.

April 2025 — Delivered a calendar-centric scheduling UI with multi-calendar support, stabilized testing, and cleaned authentication/merge artifacts for MiniCapstone-Project/SOEN390. Key outcomes include UI components for date-based views, robust event handling, and test infrastructure improvements that enable reliable CI and faster iteration. The work enhances scheduling usability, reliability of tests, and repository maintainability.
April 2025 — Delivered a calendar-centric scheduling UI with multi-calendar support, stabilized testing, and cleaned authentication/merge artifacts for MiniCapstone-Project/SOEN390. Key outcomes include UI components for date-based views, robust event handling, and test infrastructure improvements that enable reliable CI and faster iteration. The work enhances scheduling usability, reliability of tests, and repository maintainability.
Monthly work summary for 2025-03 focused on delivering user-centric map navigation features, robust POI search, and calendar integration, with UI polish and groundwork for future features. The work enhances campus wayfinding, UX consistency, and backend/frontend integration, setting a strong foundation for future capabilities and cross-team collaboration.
Monthly work summary for 2025-03 focused on delivering user-centric map navigation features, robust POI search, and calendar integration, with UI polish and groundwork for future features. The work enhances campus wayfinding, UX consistency, and backend/frontend integration, setting a strong foundation for future capabilities and cross-team collaboration.
February 2025 monthly summary for MiniCapstone-Project/SOEN390: Delivered a robust directions feature with location-based navigation, map display, and route estimates; integrated Google Places Autocomplete with debounced search to optimize API usage; refactored the codebase for modularity; established a component-driven architecture with types and styles directories; and prepared testing scaffolds for QA readiness. Location permissions were verified and styling applied. This work enhances user experience, reduces friction in navigation planning, and lays a scalable foundation for future enhancements.
February 2025 monthly summary for MiniCapstone-Project/SOEN390: Delivered a robust directions feature with location-based navigation, map display, and route estimates; integrated Google Places Autocomplete with debounced search to optimize API usage; refactored the codebase for modularity; established a component-driven architecture with types and styles directories; and prepared testing scaffolds for QA readiness. Location permissions were verified and styling applied. This work enhances user experience, reduces friction in navigation planning, and lays a scalable foundation for future enhancements.
Overview of all repositories you've contributed to across your timeline