EXCEEDS logo
Exceeds
avail-0

PROFILE

Avail-0

Overall Statistics

Feature vs Bugs

80%Features

Repository Contributions

59Total
Bugs
3
Commits
59
Features
12
Lines of code
386,701
Activity Months7

Work History

November 2025

5 Commits • 2 Features

Nov 1, 2025

Month: 2025-11. In PURPL-Purdue/Turbopump, injector modernization and CAD asset updates were completed. Key features delivered: Gas Generator Injector Component Update (added TRBP_GasGenerator_Injector_V6.0.prt as a new component, removed the deprecated V6.0 version, and added a version 2.0 test file to support modernization) and Gas Generator Subassembly CAD Updates (updated CAD files with new versions and removed an outdated file). These changes were implemented via three injector-related commits and two CAD-related commits. Major maintenance actions fixed alignment gaps and reduced risk by removing deprecated assets and ensuring test coverage for V2.0. Overall impact: accelerates injector modernization workflow, improves CAD asset integrity, and strengthens the foundation for downstream integration. Technologies/skills demonstrated: CAD/CAM modeling, versioned asset lifecycle, test scaffolding for V2.0, and disciplined Git-based change tracking.

April 2025

5 Commits • 1 Features

Apr 1, 2025

April 2025: Focused asset/config optimization for Gas Generator Injector (TRBP_GasGenerator_Injector.prt) across PURPL-Purdue/Turbopump. No functional changes introduced; established asset baseline and cross-subsystem consistency to enable faster future feature work and safer deployments.

March 2025

7 Commits • 1 Features

Mar 1, 2025

March 2025 for PURPL-Purdue/Turbopump: Implemented Gas Generator Injector CAD and manufacturing data updates, consolidating seven commits into a single user-facing improvement. This included updates to CAD models (GasGeneratorInjector_02-27.SLDPRT), injector subassembly refinements, an injector overhaul, and system-wide data alignment. Created translation logs for STEP to UG and synchronized binary part files to reflect manufacturing data, enabling smoother production handoffs and reducing downstream rework. No major bugs fixed this month; actions focused on data integrity, design accuracy, and cross-tool interoperability. Business impact includes improved design accuracy, faster production readiness, and stronger traceability of CAD assets. Technologies demonstrated: CAD/PLM workflows, STEP-to-UG translation, binary data handling, and version-controlled design updates.

February 2025

10 Commits • 1 Features

Feb 1, 2025

February 2025 (2025-02): Delivered a consolidated Gas Generator Injector CAD model revision and visual upgrade for PURPL-Purdue/Turbopump, cleaning up obsolete parts/STEP files and updating assemblies to enhance manufacturing readiness and simulation data. Focused on data integrity, visuals, and traceability to support downstream manufacturing and analysis.

January 2025

6 Commits • 2 Features

Jan 1, 2025

January 2025 – PURPL-Purdue Turbopump: Delivered CAD model updates for Gas Generator Injector and MiniTorch, with test assets and validation data to support design revisions and downstream testing. Gas Generator Injector work included multiple commits updating GasGenerator_Injector_V10.SLDPRT and adding injector test piece CAD; MiniTorch CAD updated to reflect configuration changes. No major bugs fixed this month. Impact: improved design fidelity and validation readiness, enabling more reliable simulations and manufacturing alignment. Skills demonstrated: SolidWorks CAD updates, version control practices, test asset generation, and cross-team collaboration.

November 2024

24 Commits • 4 Features

Nov 1, 2024

Month 2024-11 — PURPL-Purdue/Turbopump: Focused CAD updates and repository hygiene to accelerate design-to-build cycles and reduce asset confusion. Key design work targeted injector and nozzle components with cross-cutting CAD improvements across multiple files, plus cleanup to improve data integrity and collaboration.

October 2024

2 Commits • 1 Features

Oct 1, 2024

Month 2024-10: Focused on stabilizing the Turbopump CAD workspace and upgrading a critical component. Delivered an upgrade of the Gas Generator injector to version 10 and cleaned the CAD repository by removing a stray temporary backup file, reducing confusion and preventable build issues. The work demonstrates a strong combination of hardware design discipline, change management, and CI-friendly traceability, delivering tangible business value through a cleaner repository, reduced build risk, and a ready base for further performance and reliability improvements in the gas generator subsystem.

Activity

Loading activity data...

Quality Metrics

Correctness78.0%
Maintainability77.4%
Architecture78.0%
Performance77.4%
AI Usage20.6%

Skills & Technologies

Programming Languages

BinaryCADLogNoneSLDPRTSTEPUnknown

Technical Skills

3D ModelingAssembly DesignCADCAD DesignCAD ManagementCAD ModelingCAD designCAD modelingFile ManagementGeometric ModelingGeometric RepresentationMechanical DesignMechanical EngineeringNoneSolidWorks

Repositories Contributed To

1 repo

Overview of all repositories you've contributed to across your timeline

PURPL-Purdue/Turbopump

Oct 2024 Nov 2025
7 Months active

Languages Used

BinaryCADSLDPRTSTEPLogNoneUnknown

Technical Skills

CADMechanical DesignCAD DesignCAD ManagementCAD ModelingMechanical Engineering

Generated by Exceeds AIThis report is designed for sharing and indexing