EXCEEDS logo
Exceeds
Mark

PROFILE

Mark

Over eight months, Parade Pucker Slug developed and maintained multiple user-facing plugins for the runelite/plugin-hub repository, focusing on feature delivery, version alignment, and user interface improvements. They built and integrated plugins such as Demonic Larva Tracker, Boat Hider, and Sailing Reorder, emphasizing modular plugin architecture and semantic versioning. Using shell scripting and plaintext configuration, Parade ensured seamless upgrades and compatibility across releases, reducing maintenance risk and improving user experience. Their disciplined approach to commit hygiene and release workflows enabled traceable, reproducible builds. The work demonstrated depth in plugin development and UI design, supporting a stable and evolving plugin ecosystem.

Overall Statistics

Feature vs Bugs

100%Features

Repository Contributions

20Total
Bugs
0
Commits
20
Features
11
Lines of code
25
Activity Months8

Work History

April 2026

1 Commits • 1 Features

Apr 1, 2026

April 2026: Focused on maintaining compatibility and feature readiness for the Runelite plugin ecosystem. Delivered the Demonic Larva Tracker Plugin: Version 1.9 Update to runelite/plugin-hub, aligning with repository hash changes and ensuring compatibility with the latest plugin features. No major bugs fixed this month; primary effort centered on compatibility and release hygiene to reinforce stability for users and contributors.

March 2026

4 Commits • 2 Features

Mar 1, 2026

March 2026 monthly summary for runelite/plugin-hub: Delivered critical plugin updates by syncing two plugins to the latest versions, ensuring new features, fixes, and stability for end users. Focused on robust integration with the plugin hub and preserving compatibility across releases.

February 2026

1 Commits • 1 Features

Feb 1, 2026

February 2026 monthly summary for runelite/plugin-hub focusing on delivering a streamlined user interface for buff information and minimizing surface area while maintaining feature parity with user expectations.

January 2026

1 Commits • 1 Features

Jan 1, 2026

Month: 2026-01 — Focused upgrade of the Boat-hider plugin in the runelite/plugin-hub repository to the latest version, aligning with upstream changes and improving stability. This work reduces maintenance risk and ensures users benefit from the latest improvements with minimal disruption. No major bugs fixed this month; primary emphasis was feature refresh and code hygiene around versioning and dependencies.

December 2025

3 Commits • 2 Features

Dec 1, 2025

December 2025: Delivered two new plugins for runelite/plugin-hub and updated versioning to support better UX and ecosystem growth. The Boat Hider Plugin was released as v1.0.2 to reduce UI clutter by hiding boats, with commits 3a03a3f71a3c3cdc4769e75d81363bf9cf6d30b3 and e6bd4a278617d073174afa67b60e6e25008ca728. The Sailing Reorder Plugin was added to streamline sailing-related task management, commit bee7e565396e96ac5ca55575d49b22e9db5f5c6d. No major bugs fixed this month; minor maintenance fixes were bundled with the v1.0.2 update. Impact: Enhanced user experience, improved task workflows for sailing, and strengthened plugin hub offerings. Skills: modular plugin architecture, semantic versioning, feature-centric development, and precise commit traceability.

October 2025

2 Commits • 2 Features

Oct 1, 2025

Concise monthly summary for 2025-10 focusing on runelite/plugin-hub contributions. Delivered two user-facing features via careful pointer management and new plugin integration, with explicit commit references to ensure traceability and reproducible builds.

August 2025

6 Commits • 1 Features

Aug 1, 2025

Monthly summary for 2025-08: Focused on maintenance and alignment of plugin hub references for the Demonic Larva Tracker. Delivered updates to latest releases across versions 1.3.1 through 1.5.3 to ensure users receive the latest stable tracker plugin. No critical bugs fixed this month; primary work centered on dependency updates, release readiness, and ensuring compatibility with the latest tracker releases. This reduces support overhead, improves end-user stability, and supports ongoing feature readiness on the plugin hub.

July 2025

2 Commits • 1 Features

Jul 1, 2025

Month: 2025-07. Concise monthly summary focusing on key accomplishments for runelite/plugin-hub. Key feature delivered: - Demonic Larva Tracker Plugin: Integration into the plugin hub and configuration with a version update to 1.2.1. Major bugs fixed: - None reported this month. Overall impact and accomplishments: - Enabled seamless use of the Demonic Larva Tracker by registering it in configuration and upgrading to the latest stable release (v1.2.1), improving reliability and user experience. - Strengthened release discipline and configuration management within the plugin hub, reducing drift between plugins and their dependencies. Technologies/skills demonstrated: - Git-based feature delivery and release workflow (commit-driven changes). - Semantic versioning and dependency updates (v1.2.1). - Plugin configuration registration and integration within a structured extension hub. - Cross-functional collaboration signals via clear commit messages and versioned changes.

Activity

Loading activity data...

Quality Metrics

Correctness100.0%
Maintainability100.0%
Architecture100.0%
Performance100.0%
AI Usage20.0%

Skills & Technologies

Programming Languages

NoneShellplaintext

Technical Skills

Plugin Developmentplugin developmentuser interface design

Repositories Contributed To

1 repo

Overview of all repositories you've contributed to across your timeline

runelite/plugin-hub

Jul 2025 Apr 2026
8 Months active

Languages Used

ShellplaintextNone

Technical Skills

Plugin Developmentplugin developmentuser interface design