

November 2025: Focused on evaluating a Clos network-based crossbar design via CBG pipelining in Purdue-SoCET/aihw-design-logs. Completed weeks 11-12 exploration, documented progress, and established parameterization groundwork to enable scalable, configurable interconnects. The work sets the stage for performance/area trade-off studies and future optimizations.
November 2025: Focused on evaluating a Clos network-based crossbar design via CBG pipelining in Purdue-SoCET/aihw-design-logs. Completed weeks 11-12 exploration, documented progress, and established parameterization groundwork to enable scalable, configurable interconnects. The work sets the stage for performance/area trade-off studies and future optimizations.
Overview of all repositories you've contributed to across your timeline