EXCEEDS logo
Exceeds
McflurryTheOreo

PROFILE

Mcflurrytheoreo

Over a three-month period, contributed to the Intro-to-game-class/ProjectFalcon repository by delivering four features and resolving two bugs, focusing on asset integration, game development, and level design using Unreal Engine. Work included polishing the Volcano_sewer level’s visuals and map to enhance player immersion, implementing stability improvements and bug fixes for the Sewer module, and managing binary asset updates to maintain asset hygiene without impacting gameplay. Demonstrated disciplined use of version control with traceable commits, maintained code hygiene through systematic refactoring, and ensured reliable feature delivery. The approach emphasized stability, maintainability, and a strong foundation for future content enhancements.

Overall Statistics

Feature vs Bugs

67%Features

Repository Contributions

36Total
Bugs
2
Commits
36
Features
4
Lines of code
1
Activity Months3

Work History

December 2024

1 Commits • 1 Features

Dec 1, 2024

December 2024: Asset management and non-gameplay-changing update for Project Falcon. Delivered a binary asset update for Volcano_sewer level with no gameplay changes, verified integrity, and ensured traceability through a focused commit. The work reinforces asset freshness while preserving gameplay stability and sets the stage for upcoming visual updates.

November 2024

30 Commits • 2 Features

Nov 1, 2024

November 2024 performance summary for Intro-to-game-class/ProjectFalcon: Delivered foundational stability improvements and robust Sewer module reliability across 30 commits. Implemented Codebase Updates and Stability Enhancements (2 commits) to tighten baseline functionality. Fixed Sewer module bugs across 13 commits, addressing cross-cutting issues and improving resilience. Rolled out a series of Sewer enhancements (10 commits) to refine feature set and performance. Performed System Maintenance Updates (5 commits) to strengthen reliability. This work reduces risk, accelerates feature rollout, and lays groundwork for upcoming game-class features. Technologies/skills demonstrated include code hygiene, refactoring discipline, stability engineering, thorough bug triage, and cross-commit traceability.

October 2024

5 Commits • 1 Features

Oct 1, 2024

Concise monthly summary for 2024-10: Delivered a key feature for Intro-to-game-class/ProjectFalcon by polishing Volcano_sewer level visuals and updating the level map. This work enhanced visuals, layout, and immersion in a core area, supporting player engagement and retention. No major bugs reported in this cycle; the changes are feature-focused with a clear iteration trail. Impact includes improved player experience in a core environment and a solid foundation for future content. Demonstrated proficiency in level design, asset integration, and version-control disciplined delivery.

Activity

Loading activity data...

Quality Metrics

Correctness59.4%
Maintainability59.4%
Architecture57.8%
Performance57.8%
AI Usage20.0%

Skills & Technologies

Programming Languages

Unreal Engine

Technical Skills

Asset IntegrationGame DevelopmentLevel Design

Repositories Contributed To

1 repo

Overview of all repositories you've contributed to across your timeline

Intro-to-game-class/ProjectFalcon

Oct 2024 Dec 2024
3 Months active

Languages Used

Unreal Engine

Technical Skills

Asset IntegrationGame DevelopmentLevel Design