EXCEEDS logo
Exceeds
Clare Hess

PROFILE

Clare Hess

Over a three-month period, contributed to frc2399/2025-season by developing and refining core robotics subsystems, focusing on safety, reliability, and maintainability. Built and integrated climber and elevator subsystems with motion profiling, PID tuning, and hardware abstraction, leveraging Java and C++ within a command-based framework. Enhanced drive safety by implementing speed limiting tied to elevator height and improved subsystem coordination for tasks like algae and coral handling. Addressed CAN bus optimization, code cleanup, and configuration management to support robust autonomous operation and faster iteration. Debugging, telemetry, and refactoring efforts resulted in a more stable, testable, and maintainable codebase.

Overall Statistics

Feature vs Bugs

78%Features

Repository Contributions

81Total
Bugs
8
Commits
81
Features
28
Lines of code
2,677
Activity Months3

Work History

March 2025

17 Commits • 5 Features

Mar 1, 2025

March 2025 (frc2399/2025-season) monthly highlights focused on safety, reliability, and maintainability. Delivered key control improvements across algae handling, coral wrist/elevator coordination, and drive systems, with telemetry enhancements and code hygiene to support future iterations and safer lift operations.

February 2025

58 Commits • 21 Features

Feb 1, 2025

February 2025 (2025-02) monthly summary for frc2399/2025-season. Delivered progress across key subsystems with emphasis on reliability, hardware integration, and maintainability. Key features progressed include suppression of joystick warnings and stabilization of autonomous command execution, elevator system enhancements with current-position hold, configurable height, and improved setpoints, Kraken subsystem core construction with methods and its integration into the subsystem factory plus CAN ID updates, and climber hardware migration to Spark Flex for improved reliability. Manual motion profiling groundwork advanced (atGoal scaffolding). Comprehensive code cleanup and PR feedback resolution reduced debt and stabilized the codebase. Business value includes more predictable autonomous performance, safer elevator operations with configurable setpoints, and faster iteration cycles through a cleaner, more maintainable architecture.

January 2025

6 Commits • 2 Features

Jan 1, 2025

January 2025 monthly performance summary for frc2399/2025-season focused on foundational subsystems, safety, and test readiness. Climber subsystem introduced and integrated into RobotContainer with basic extend/retract and height management; safety enhanced with current limit. Elevator subsystem evolved with motion profiling groundwork, position setting/getting refactors, and PID/tuning improvements; updated commands and motor IDs. Conducted Alphabot testing to validate PID tuning and system stability. Code review and cleanup activities to improve inversion handling and future iteration speed.

Activity

Loading activity data...

Quality Metrics

Correctness82.8%
Maintainability84.8%
Architecture80.4%
Performance75.0%
AI Usage21.0%

Skills & Technologies

Programming Languages

Java

Technical Skills

C++CAN BusCAN Bus OptimizationCode CleanupCommand-Based FrameworkCommand-Based ProgrammingConfigurationConfiguration ManagementConstants ManagementControl SystemsDebuggingEmbedded SystemsFactory PatternHardware AbstractionJava

Repositories Contributed To

1 repo

Overview of all repositories you've contributed to across your timeline

frc2399/2025-season

Jan 2025 Mar 2025
3 Months active

Languages Used

Java

Technical Skills

Command-Based FrameworkControl SystemsEmbedded SystemsHardware AbstractionJavaMotion Profiling